top of page
Search

Previous Projects

  • powderriverhandyma
  • Dec 27, 2024
  • 1 min read

Updated: Oct 2, 2025


Fence build on 4th and auburn
Fence build on 4th and auburn

Customer wanted to have a fence with picture frame style



Before and during

Cedar Fence Build Front and Back Yard


Before and After patio and fence build
Before and After patio and fence build

Started with removing old concrete pad (2000 LBS) and installed patio as well as cedar picket fence.




Beginning and End

Patio Build with old bricks customer had



Beginning and End

Toilet on the second floor overflowed and blew out drywall. Repaired drywall and retextured to match as well as repainted celling.



Tiling Shower

Remodel of bathroom included installing tub and shower and tiling




Deck Resurface

Deck was in bad shape. removed rotten sections and reinforced them once that was finished sanded the whole deck and stained it.




Sturdy Steps

Customer wanted her older step that was becoming detached from deck replaced with sturdy steps and hand rail.



Celling Drywall

Customer wanted celling to be roughed in with drywalled




Deck Build

Customer wanted to have the deck built and used treks boards



 
 
 

Comments


bottom of page